Linde
EVENT:
Linde 116 Truck Launch
LOCATION:
ExCeL Centre, London UK
DURATION:
4 Days
AUDIENCE:
Linde Reach Truck Potential Product Users
THE BRIEF:
To provide a load-bearing domed superstructure for the new Linde 116 Reach Truck Product Launch.
DESCRIPTION:
The Linde event took place within the Excel Centre in East London and consisted of demonstrations during the day and a gala meal and show in the evening. GaiaNova supplied the 18m Gaiaspace Structures GT3 Series Dome as a 'naked' structure. It acted as the central hub area where the client could meet and greet potential buyers. The Dome was carpeted throughout and featured a central circular bar and coffee servery with cocktail-style tables and chairs.







